will be used to repair the (Cause of loss) damage(s) to the referenced property that occurred on (Date of loss), and that the repairs will be made in compliance with all local building codes and that no material or labor liens will be permitted against the property as a result of the labor performed or materials used.
Note: For faster delivery, UPLOAD form on our website or FAX to .